PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed rebar at the detention cells Facing West.jpg Installing copper piping at the 2nd floor Bathroom Facing South.jpg Installing ductwork fitters at the 3rd floor Facing West.jpg Installing VAV boxes at the 3rd floor Facing East.jpg Laying out block at Room EMR 150A Facing South.jpg Copper piping at the 4th floor bathrooms Facing South.jpg Erecting stone panels at the North Elevation.jpg
Previous pageNext page Laying out block at Room EMR 150A Facing South
Laying out block at Room EMR 150A Facing South